Jump to main content Jump to footer
[Translate to Englisch:] Monheim Mitte Rendering
[Translate to Englisch:] Monheim Mitte Rendering
[Translate to Englisch:] Monheim Mitte Rendering
[Translate to Englisch:] Monheim Mitte Rendering
Germany

Monheim Mitte

In the heart of Monheim Mitte, WIEHAG executes the structural system, façade assemblies, and roof elements for four newly constructed timber-hybrid buildings.
The timber-hybrid ensemble, designed by Heine Architekten (Hamburg), is based on a structurally efficient primary system comprising timber columns, timber-concrete composite ribbed slabs, and prefabricated timber frame façades. WIEHAG Timber Construction is responsible for the structural framework as well as the wall and roof elements for three of the four buildings.
Sustainability

Holistic Sustainability Across All Building Systems

The Monheim Mitte project is deliberately guided by sustainable construction principles: extensive green roofs, large-scale photovoltaic systems, and generous green spaces enhance the microclimate and promote biodiversity.
The hybrid construction method – combining timber, concrete, and steel – reduces material consumption, optimizes life-cycle costs, and lowers CO₂ emissions.
A high degree of prefabrication further shortens construction time and minimizes on-site emissions.

Skip slider
Jump to slider start
Task

Integrated Complexity in Structure and Execution

Execution demands the highest level of precision in both planning and assembly:

  • Integration of timber-concrete hybrid structures under seismic design requirements

  • Development and installation of prefabricated façade elements, including window systems

  • Coordination of multiple materials and interfaces under constrained urban construction conditions

Skip slider
Jump to slider start
Implementation

Integrated Hybrid Construction Expertise from a Single Source

WIEHAG Timber Construction is responsible for the cross-trade execution of the structural system, façade, and roof:

  • Load-bearing structure composed of glulam columns, precast concrete beams, and timber-concrete composite ribbed slabs

  • Prefabrication of wall and roof elements in timber frame construction, including windows and doors

  • Fabrication and installation of steel components

Skip slider
Jump to slider start
Project Profile
Client
Baumberger Einkaufszentrum GmbH
Architect
Heine Architekten Partnerschaft mbB, Hamburg
WIEHAG Scope of Work
Structural system and building envelope (roof and wall elements), structural engineering support, shop drawings, production, and installation
Glulam Volume
750 m³
Gross Floor Area
approx. 33,000 m²
Construction Start
2026
Floors
4 (partially 5)
Other references

Discover WIEHAG’s engineering skills

Skip slider
  • Multi-storey timber construction
Anna Lindh Haus, Berlin
  • Culture, Sports and leisure centres
  • Multi-storey timber construction
Life, Hamburg
  • Logistics, retail, industry
Garbe Solid Timber Hall, Straubing
  • Multi-storey timber construction
Atlassian Central, Sydney
  • Culture, Sports and leisure centres
World of Volvo, Gothenburg
  • Multi-storey timber construction
The CubeHouse, Amsterdam
  • Culture, Sports and leisure centres
Kviberg Ice and Sports Hall, Kviberg
  • Multi-storey timber construction
Mediavaert - DPG Media House, Amsterdam
  • Logistics, retail, industry
Logistics Center EDEKA, Marktredwitz
Jump to slider start
YouTube is deactivated

We need your consent to use YouTube videos. For more information, see our Privacy Policy.

Vimeo is deactivated

We need your consent to use Vimeo videos. For more information, see our Privacy Policy.

Google Maps is deactivated

We need your consent to use Google Maps. For more information, see our Privacy Policy.