The Mill - Queenstown Sports Performance Hub
QUEENSTOWN (NZ)
In Queenstown, New Zealand, The Mill Sports Performance Hub brings together high-performance sport, wellbeing and sustainable architecture. Designed for training, rehabilitation and recovery, the 2,500 m² facility features an open timber structure with a distinctive glulam framework engineered by WIEHAG, manufactured in Austria and delivered to New Zealand ready for installation.
PROMOTING HEALTH
CONSERVING RESOURCES
Health and sustainability are integral to The Mill, influencing every aspect of the building, including its construction. The glulam structure stores biogenic carbon throughout its lifespan and replaces conventional, emissions-intensive building materials in key areas. Its low weight reduced foundation requirements and overall material consumption, while industrial prefabrication enabled a resource-efficient construction process with minimal waste.
Abundant daylight, natural ventilation and a connection to the surrounding alpine landscape are central to the building’s design, creating a pleasant environment for exercise and recovery that promotes the wellbeing of its users. Open to both the local community and elite athletes, The Mill serves as a sports and health centre that brings together environmental and social benefits through responsible construction.
The design establishes a strong connection to the surrounding landscape and context. The use of mass timber allows us to achieve a dynamic floor plan and flexible spaces, ensuring that the Sports Performance Hub not only meets its functional requirements, but also serves as a model for sustainable and health-conscious architecture.
PRECISELY PLANNED AND MANUFACTURED
AROUND THE WORLD IN 70 DAYS
WIEHAG’s Timber Intelligence was integral to the design and delivery of The Mill’s timber structure, encompassing structural engineering, detailed design, production and international logistics.
The glulam columns and beams were meticulously designed in a detailed 3D model incorporating every component and connection. Based on this model, a total of 452 CNC-machined glulam components were manufactured at our facility in Altheim, Austria. Eight containers carrying 260 m³ of glulam were then delivered to New Zealand on schedule in approximately 70 days.
Detailed advance planning and close coordination between all project partners enabled millimetre-precise installation without any on-site modifications, allowing the structural shell to be completed five weeks ahead of schedule.