The Cubehouse
WIEHAG The Cube House Amsterdam
WIEHAG The Cube House Amsterdam
SO-IL, NEW YORK

THE CUBEHOUSE
AMSTERDAM (NL)

As the first timber-hybrid building in Amsterdam’s Zuidas district, CubeHouse has set a new benchmark for future workplace design. For this forward-looking project, WIEHAG was responsible for the entire timber structure – from structural engineering and shop drawings through fabrication and delivery to on-site installation.

With around 1,000 m³ of glulam and 2,500 m³ of CLT across 13 storeys, WIEHAG Timber Intelligence has become a built reality in Amsterdam.

TIMBER INTELLIGENCE

COMPLEX STRUCTURAL ENGINEERING
AN INTEGRATED APPROACH

WIEHAG Timber Construction was involved from the design phase as a specialist in engineered timber construction and was responsible for the structural engineering, shop drawings, fabrication, delivery and installation of the timber structure for CubeHouse.

The hybrid system combines an in-situ reinforced concrete core with glulam columns and beams, CLT floor panels, steel bracing and load distribution frames. In addition to carrying vertical loads, the CLT elements act as diaphragms, transferring horizontal loads to the primary bracing elements. Steel bracing and the reinforced concrete cores provide the overall horizontal stability of the building. Additional steel beams distribute loads and reduce the structural depth to accommodate building services.

A particular engineering challenge was designing for the potential loss of a column. To address this, our engineering team developed a continuous beam system spanning at least two bays. To prevent compression of the timber perpendicular to the grain, specially engineered solutions were developed at the beam continuity connections.

The complexity of the project required early coordination between all parties. All timber components were prefabricated at our facility and delivered to site ready for installation. A detailed installation strategy shortened the construction period while providing the best possible weather protection for the timber structure.

WIEHAG The Cube House Amsterdam
TIMBER IMPACT

HIGH-EFFICIENCY TIMBER STRUCTURE
SUSTAINABILITY AS A GUIDING PRINCIPLE

CubeHouse demonstrates how timber construction can make better use of existing urban sites through urban densification, while supporting climate-conscious design. The hybrid timber structure was built above an existing underground car park. Its significantly lower self-weight allowed a taller building to be constructed on the existing structure than would have been possible using concrete, for example.

Around 75% of the materials used in the building’s structural frame are bio-based, predominantly timber, storing a significant amount of carbon within the building over the long term. Photovoltaic panels on the roof and façade provide around 80% of the building’s energy requirements. A rainwater collection and reuse system, green roofs and “Breathe Spaces” also increase resilience to extreme weather.

BREEAM Excellent and WELL Gold certifications reflect the project’s holistic approach to achieving the highest standards of sustainable construction.

TIMBER HIGHLIGHT

EXPOSED TIMBER STRUCTURE
BRINGING NATURE INTO THE WORKPLACE

The distinctive design by architects SO–IL reimagines the office building as an open and permeable part of the city. A robust, publicly accessible base connects the building with the surrounding Zuidas district. Above, a contemporary workplace rises through an exposed timber structure that creates a warm and inspiring environment.

Three landscaped “Breathe Spaces” on the sixth, seventh and eighth floors form an integral part of the architecture. These daylight-filled buffer zones between the outer and inner façades regulate light and climate while creating a seamless transition between indoor and outdoor spaces. They are complemented by a publicly accessible rooftop garden, bringing nature and biodiversity into the densely developed business district.

The result is a design that promotes wellbeing and makes the timber structure a visible expression of a new, people-focused workplace culture.

PROJECT Details
Client
G&S&
Architect
SO-IL, New York
Contracting Partner
Visser & Smit Bouw
Structural Engineering, Shop Drawings, Fabrication & Installation
WIEHAG Timber Construction
Construction Start
2024
Completion
2025
Total Floor Area
16,300 m²
Glulam Volume
1,000 m³
CLT Volume
2,500 m³

More Projects

Skip slider
World of Volvo, Gothenburg
Ascent Tower, Milwaukee
Kyklos Centre for Arts and Cultures, Piraeus
Atlassian Central, Sydney
Gaia - Nanyang Technological University, Singapore
Jump to slider start
YouTube is deactivated

We need your consent to use YouTube videos. For more information, see our Privacy Policy.

Vimeo is deactivated

We need your consent to use Vimeo videos. For more information, see our Privacy Policy.

Google Maps is deactivated

We need your consent to use Google Maps. For more information, see our Privacy Policy.